We are excited to announce the successful completion of Phase 1 of the STOREX Self Storage project in Cricklewood, London! Appointed by EQT Exeter as the construction managers and principal contractors in November 2023, Morda Construction has delivered a state-of-the-art self-storage facility with integrated workspace areas known as Fab Labs.

​

The redevelopment of this existing building involved significant enhancements, including additional steelwork, a new façade and roof, and a complete internal fit-out. The result is a modern facility offering high-quality storage solutions alongside Fab Lab spaces designed to support local businesses with innovative and practical workshop environments.

​

We handed over the Phase 1 works on the 31st of May, 2024, marking a key milestone in this project. This achievement reflects our commitment to delivering excellence in construction management and our ability to adapt and upgrade existing structures to meet contemporary needs. We are proud of the collaborative effort and dedication that have driven this project forward and look forward to the positive impact it will have on the Cricklewood community.

Existing Buidling

Previous Building

Converted Building

New STOREX Storage Facility

Structural Engineering Strategy

The building's original structure—a braced steel frame with composite steel deck on the first floor and precast concrete on the second—was adapted from its previous office and light industrial use to accommodate heavy floor loadings required for self-storage.

​

Using a combination of methods including 3D analysis modeling, static load testing with water bags, and innovative in-situ pile testing, we confirmed the structure's capacity to handle increased loads without additional strengthening. This approach streamlined construction, cut costs, and significantly lowered the project's carbon footprint.

Morda Construction's efficient management ensured timely and budget-conscious delivery, underscoring our commitment to sustainable construction practices and innovative engineering solutions.

Project Timeline

The photos below show the timeline and progress of the Cricklewood scheme managed by Morda Construction. From initial site investigation to the final touches, these images showcase our dedication to delivering projects with precision and efficiency. Each milestone reflects our commitment to quality construction management and achieving our clients' vision for transformative developments.

Site Setup

Site setup

Pile Testing

In-situ pile testing being undertaken

Existing Buidling

Demolition works complete including removal of cladding

Steelwork Install

Install of new steelwork to support mezzanine floor

Painting Floors

Resin paint being applied to existing slab

Static Load Testing

Structural load test being undertaken

Removal of Roof

Removal of existing roof

Cladding Install

Installation of cladding

Floor Coated

Completion of resin paint on ground floor

Storage Units

Completion of storage units

Fab Labs

Workspace 'Fab Lab' for local businesses

Shop

Shop / reception for storage facility

STOREX Development

Completion of STOREX Self Storage Phase 1

Commitment to Sustainability

This project showcases our commitment to sustainability. By implementing advanced energy strategies and upfront carbon reduction measures, we have significantly reduced carbon emissions, meeting the Committee on Climate Change recommendations for all-electric buildings and improving the EPC rating from D to A+.

​

Key sustainability highlights include:

​

  • Retaining and reusing the existing foundation and structural frame, reducing upfront carbon by 30% and embodied carbon by 15% compared to typical retail developments.

  • Achieving 389 kg CO2e/m² of upfront carbon, well below the GLA aspirational benchmark of 550 kg CO2e/m².

  • Implementing high thermal performance, airtight construction, heat recovery systems, low energy lighting, and intelligent controls.

  • Installing a ~300m² PV array generating approximately 67,500 kWh/year, surpassing the London Plan zero carbon target and supplying surplus energy to nearby developments.

​​

Recognition & Awards

We are proud to announce that our team achieved 3rd place in the prestigious GRI Awards. Additionally, we reached the finals in both the Conversion of the Year and Sustainability Award categories at the FEDESSA European Self Storage Awards, demonstrating our commitment to excellence and sustainability in construction management.

​